TDF feedback on telecom operations with our SHP Unit in the west of France

Sigogne resized

“ After several months of usage of the SHP Unit, we can confirm the following advantages of the SHP:

- A quick and easy installation: it takes about 1/2 a day to set it up, and the setup is entirely done by Cysalys

- All the operational information is available remotely and real time through the Remote Management System

- Thanks to the hybrid system with solar panels, the fuel consumption is minimal compared to a traditional electric generator, and there is almost no maintenance

- The SHP unit will adjust its production to the consumption of the tower: if there is no energy needed, there is no fuel consumption (unlike a traditional diesel generator). We were able to verify this physically on site

The SHP unit is also a selling point for our customers who refuse traditional diesel generators, as these may have unstable power production

To conclude: TDF may now offer a very reliable temporary solution while waiting for grid connection. ”

M. Frédéric DESTREZ

Operational project coordinator for TDF in South West of France